EFFECTIVE IMMEDIATELY

Eisenhower Road between 10th Avenue/Mt. Calvary Road and 20th Street/New Lawrence Road will be closed to thru traffic. All residents located on this stretch of Eisenhower Road will have continued access to their properties. Please follow the posted detour while we continue construction.

Monday, September 13th, 2021
Kansas Avenue will be closed on Monday for a Tonganoxie sewer installation.  The contractor expects the construction to last approximately a week.
Kansas Ave - Road Closed - Copy


Thursday, September 2, 2021
We will be closing Rt 25 (206th) Street for a cross road culvert replacement.  This will take place from 8 a.m. until 4:30 p.m.  This is located between Sandusky and Evans Road. (750ft South of Sandusky.)

206 Evans-Sandusky Closure



The De Soto River Bridge over the Kansas River is NOW OPEN. 

DeSoto River Bridge



SH-30 Bridge Replacement Road Closure (158th) Street
The SH-30 Bridge Replacement project is scheduled to start on Monday, June 21. 158th Street, south of Archer Road, will be closed, for the duration of the project, at the crossing of Kaw Creek. Detours and road closure signs will be posted. Dondlinger Construction is scheduled to complete this project 90-days after they begin.
SH-30 Bridge Replacement


Road Closure update effective by the end of day of Friday, June 11th, 2021

Eisenhower Road between Branches way and 20th Street/New Lawrence Road will be closed to all traffic except for limited access to emergency vehicles and residents located on this stretch of Eisenhower Road. (See yellow location)

Access onto Eisenhower from Branches Way  will be closed and traffic will be required to use Birch Street. Access to Eisenhower Road from 162nd Street will be closed and a temporary access must be used off of Sloan Road. Traffic to and from the cities should use 20th Street and Tonganoxie Rd to route around the road closure.


Eisenhower from Branches way


Tuesday, May 4, 2021
SH-22 Bridge Replacement- 206th Street will be closed on Monday, 5/17/2021 for a bridge replacement over Ninemile Creek.  There will be no traffic allowed through this closure during construction, all vehicles must utilize an alternate route.  The project is expected to take approximately 180 days, with completion no later than 11/17/2021.

SH-22 (206th)


Friday, February 26, 2021
Eisenhower Rd West 20th Street
  1. Staggered Road Closure Barricades of Eisenhower Road at Intersection with Tonganoxie Drive (LVCO 5).  To allow access for first resident located on Eisenhower east of intersection.
  2. Full Road Closure Barricades of Eisenhower immediately east of first residence driveway.
  3. Full Road Closure Barricades of Birch Street at Intersection with Eisenhower.
  4. Full Road Closure Barricades of Eisenhower immediately west of intersection with Branches Way/162nd Access will be limited to Emergency Vehicles and Local Residents.
  5. Staggered Road Closure Barricades of Eisenhower Road immediately west of intersection with 20th Access will be limited to Emergency Vehicles and Local Residents.

This is going to be worked on in stages. This area of Eisenhower (West of 20th Street) will be closed possibly through the end of the year. Sorry for the inconvenience.

Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category